Industry & Testing

Energy-intensive industrial companies face the challenge of reducing their primary energy factor substantially and replacing natural gas step by step with climate-friendly alternatives – without putting the stability of their production processes at risk. That is exactly where we come in.

Phase 1 — Ready for immediate use

We make a pragmatic entry into hydrogen use possible – initially through a flexible supply of hydrogen by trailer. Substituting natural gas can therefore begin immediately, without long lead times or complex conversion work. This interim solution creates planning certainty and allows processes to be tested under real H₂ conditions and adapted step by step.

Phase 2 — Long-Term Independence

Where energy demand is permanently high, we develop the next step with you: integrating your own electrolysis plant on site. In time you produce your own hydrogen and reduce not only emissions but also your dependence on external energy sources.

Looking for an emission-free alternative?

Write to us →

Referenz: Industrie / Ingenieurwesen und Technologie

Reliable hydrogen logistics for the EDAG site in Stuhr

EDAG Engineering GmbH is one of the world’s leading independent engineering service providers for the mobility, industrial and public sectors. At its Stuhr site, EDAG operates specialised infrastructure for demanding hydrogen applications. FPS.Energy has been responsible for the reliable hydrogen supply to the site since February 2025 – the hydrogen required is delivered in 40-ft trailers at 200 bar and is available for demanding development and testing work.

40-ft

trailer size for delivery

200 bar

pressure level of the delivery

seit 02/2025

partner at the Stuhr site

From the start of the project, FPS.Energy has supported EDAG as a reliable partner in the operational hydrogen supply. Close collaboration, combining EDAG’s engineering and hydrogen expertise with FPS.Energy’s supply and logistics expertise, ensures that the hydrogen supply is reliable and safe and that operations at the Stuhr site continue without interruption.

Unsere Leistungen

  • Continuous hydrogen supply to the site
  • Lieferung in 40-ft-Trailern (200 bar)
  • Support with commissioning the trailer delivery station
  • Safe execution of unloading operations
  • Carrying out trailer changes
  • Regular maintenance of the trailers
  • Technical support and reliable service

“A reliable hydrogen supply is an important basis for operating our demanding infrastructure at the Stuhr site. As a dependable partner, FPS.Energy ensures a safe and continuous supply.”

— Marius Koch, Standortleiter Stuhr, EDAG Engineering GmbH